Knitting 2011

I thought it would be fun to track my knitting progress for 2011.  Below are listed my completed projects (started/finished in a single month) listed by months.

January:

  1. Six Stitches Per Inch Sock (January 2011 YOSS project)
  2. Pink Alpaca Thuja Socks
  3. Right-handed Fingerless Mitts
  4. Fast and Easy Fingerless Mitts
  5. Newborn Socks
  6. Isabella’s Socks
  7. Isabella’s Swirl Hat
  8. Midwinter Mitts
  9. Handspun House Socks

February:

  1. Handspun Green Thumb
  2. Celtic Moonrise Mittens (February 2011 YOSS project)
  3. Basic Mitten in Pidgeon Twist
  4. Kalmia
  5. Calorimetry
  6. Faro Easy

March:

  1. Short Row Toe and Heel Basic Socks (March 2011 YOSS project)

April:

  1. Nothing

May:

  1. Henley with a Twist (frogged)
  2. Vine Flower Child’s Dress

June:

  1. Summer Mystery Shawlette (started 5/15 and finished 6/2)
  2. Camp Loopy Whippoorwill (first Camp Loopy project)

Links to Ravelry Project Page indicates a link to a Ravelry project page.